Rodney ๐ง๐
chanface.bsky.social@bsky.brid.gy
๐๏ธ๐ Co-host of @dwelltime.ca, a transit podcast<br /><br />๐๐ฒ Co-lead at @TriTAG.ca<br /><br />Transit Politics & Planning | Housing | Cities | 24 | @uwaterloo.ca Planning | Toronto/Waterloo | ๐จ๐ฆ๐ณ๏ธโ๐๐ญ๐ฐ<br><br>๐ <a href="https://fed.brid.gy/bsky/chanface.bsky.social">bridged</a> from ๐ฆ <a href="https://bsky.app/profile/chanface.bsky.social">chanface.bsky.social</a>, follow <a class="h-card u-author mention" rel="me" href="https://bsky.brid.gy/bsky.brid.gy" title="@bsky.brid.gy@bsky.brid.gy">@bsky.brid.gy</a> to interact
Posts
-
View post
9 months after opening, Line 5 Eglinton LRT is still waiting for left turning cars ahead of it, causing 30 seconds of delay. Now imagine how these delays compound over a dozen intersection it crossed through. Mayor Chow and the new TTC board have no excuse to ignore such low hanging fruit.